Owens Alley Dust Mitigation Pipeline Phase 3

1-25-04 To 5-20-04

Approximately 8.3 Miles Of 54″ x .375 Walls Welded Steel Pipe (Bell And Spigot).

General Contractor: Barnard Construction

Reference: John Maxwell 760-876-0010

Owens Valley, Ca

Contract Amount: $586,345.00

Owner: Los Angeles Department of Water And Power

Saluda Dam Rehabilitation Phase 1

6-12-03 To 12-22-03

Approximately 1000 Feet Of 72″ x .500 Wall Welded Steel Pipe (Bell And Spigot)

and 300 Feet Of 84″ x .500 Wall Welded Steel Pipe (Full Penn Butt Welds - Casing).

General Contractor: Barnard Construction

Reference: Neil Warden 406-586-1995

Lexington, Sc

Contract Amount: $110,000.00

Owner: Lexington Water And Power

Pleasant Valley Pipeline

5-30-03 To 11-30-03

Approximately 4.5 Miles Of 67″ x .283 Wall Welded Steel Pipe (Bell And Spigot).

General Contractor: Barnard Construction

Reference: Jerry Askins 406-586-1995

Fort Collins, Co

Contract Amount: $178,545.00

Owner: Fort Collins Water And Power

Mereno Lakeside Pipeline

5-10-02 To 11-28-03

Approximately4.5 Miles Of 54″And 60″ x .313, 375, 420, and .500 Wall Welded Steel Pipe (Bell And Spigot and Full Penn Butt Welds).

General Contractor: Kenko Inc.

Reference: Mike Kenning 619-938-8076

Lakeside, Ca

Contract Amount: $263,000.00

Owner: San Diego County Water District

Sepulveda Trunk Line Unit 1.

4-5-02 To 5-16-03

Approximately 3.845 Feet of 96″ X .500 Wall Welded Steel Pipe (Full Penn Butt Welds) 100% X-Ray, Code B313.

General Contractor: Colich Construction

Reference: Russell Persion 213-367-0878

Semi Valley, Ca

Contract Amount: $286,000.00

Owner: Los Angeles Department of Water And Power